SCHEDULE OF MAJOR WORKS

PROJECT MANAGED BY

THE CURRENT DIRECTORS

AND STAFF OF

UNIVERSAL STEELS (SCOTLAND) LIMITED

 

 

SECOND CROSSING OF THE RIVER TAGUS - LISBON

 

THE VASCO DE GAMA BRIDGE

 

INITIALLY FOR                                          -            Trafalgar House Major Projects

 

ESTIMATION OF COSTS TO PRODUCE TUBULAR PILES

 

2200 O/D x various W/T 128 metres long

 

Each Piece Weight 140 tonnes

 

Quantity 900 No

 

ESTIMATION OF COST TO LAY OUT AND PROCURE ALL PLANT AND EQUIPMENT NECESSARY TO PROCESS AND FABRICATE

 

170,000 tonnes Steel Reinforcement

 

FINALLY TO PRODUCE FABRICATE SHIP AND LOAD OUT

 

55000 tonnes Steel Tubular Piles 1700 mm O/D x 22 mm W/T

 

In Continuous Length of 98,000 mm

 

 

 

 


2

 

 

 

 

 

 

CONTAINER TERMINAL PHASE II - GRAND BAHAMA

 

CONTRACTOR               -                        Costain Construction Limited

 

Production, Protective Coating and Fabrication of Combi-Wall Piling System

 

1220 mm O/D - Larssen LX 32

 

QUANTITY                      -                        2600.00 tonnes

 

DELIVERY                       -                        Direct by sea

 

 

POINT DE GREIVES CONTAINER TERMINAL - MARTINIQUE

 

CONTRACTOR               -                        Bougyes Construction

 

Production and supply of Spiral Welding Plant and equipment 7000 tonnes

 

 

HEATHROW EXPRESS RAIL LINK

 

CONTRACTOR               -                        Balfour Beatty Constructions

 

Procurement and Fabrication of Heavy Tunnel opening sets

 

4000 tons

 

 


3

 

 

 

 

MARATHON OIL, "BRAE A" PRODUCTION PLATFORM

 

CLIENT                                MARATHON OIL UK LIMITED

 

ENGINEER                           CJB, LONDON

 

FABRICATORS                     (a)       McDermott                          -         Inverness, Scotland

 

                                           (b)       Dragados                           -         Cadiz, Spain      

 

                                           (c)       De Groot                            -         Rotterdam, Holland

 

SCOPE                                The production, quality management and transportation by road

                                           and sea to all fabricators of:-

 

SEAMLESS STEEL TUBULARS        4,500 tons

 

STEEL PLATE                                                            2,500 tons

 

ROLLED STEEL SECTIONS   4,000 tons

 

 

BRITISH GAS - MORECAMBE BAY DEVELOPMENT

 

FABRICATOR                       Haverton Hill Fabricators

 

SUPPLY                               3,500 tons Section, Plate, RHS, Seamless Tubulars

 

 

BRITISH GAS - ROUGH GAS STORAGE

 

FABRICATOR                       SLP Lowestoft

 

SUPPLY                               2,800 tons Section, Plate, Seamless Steel Tube

 

 

CHEVRON PETROLEUM

 

NINIAN NORTHERN PLATFORM

 

SUPPLY                               2400 tons Section, Plate, Tube


4

 

 

PHILIPS PETROLEUM

 

PHILIPS "MAUREEN" WELL HEAD TEMPLATE

 

FABRICATOR                       Weldit

 

SUPPLY                               7,000 tons steel plate

 

 

CONOCO TENSION LEG PLATFORM (TLP)

 

TLP TRUSS STRUCTURE

 

SUPPLY                               Fabricated steel tubular sections - 5000 tons

 

DELIVERED                          By road and sea

 

FABRICATORS                     (a)       McDermott                          -         Inverness, Scotland

                                          

                                           (b)       Kestral Marine        -            Dundee, Scotland

 

                                           (c)       Dragados                           -         Cadiz, Spain

 

 

MUSSELBOROUGH BY-PASS

 

MAIN CONTRACTOR                                -            Tarmac

 

Supply 2000 tonnes of Universal Bearing Piles 26-33000 mm in length

 

 

CLYDE SUBMARINE BASE - FASLANE

 

MAIN CONTRACTOR            -         Tarmac

 

Supply 1000 tonnes of Universal Bearing Piles 30,000 mm in length

 

 

CLYDE SUBMARINE BASE - FASLANE

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate, Paint and Supply 1300 tonnes of Steel Tubular Piles

 

Length Range                        -         26-38,000 mm long

 


5

 

CALEDONIAN PAPER MILL

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Supply 2300 tonnes Tubular Piles

 

Length Range                        -         25-33,000 mm long

 

HAVERINGORE BRIDGE

 

MAIN CONTRACTOR            -         Tarmac

 

Supply Part Coated 1000 tonnes of Tubular Piles 26,000 mm long

 

 

ROYAL NAVAL ARMAMENTS DEPOT - CROMBIE

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate, Paint and Supply 10,000 tonnes of Steel Tubular Piles

 

Length Range                        -         65-98,000 mm long

 

 

A94 ABERDEEN TRUNK ROAD

 

MAIN CONTRACTOR            -         Miller Construction

 

Fabricate and Erect 2 Road Bridges 700 tonnes

 

 

NEWCASTLE WESTERN BY-PASS - PHASE II

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Supply 4200 tonnes of Universal Bearing Pile

 

Length up to                          -         30,000

 

 

NEWCASTLE WESTERN BY-PASS - PHASE III

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Fabricate and Erect 3 No Road Bridges - 1200 tonnes

 

Supply 2000 tonnes Universal Bearing Piles


6

 

 

 

 

 

NEW CONTAINER TERMINAL - ISLE OF GRAIN

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate and Supply 8000 tonnes Steel Tubular Piles

 

Length                                  -         50,000 mm

 

 

OLYMPIA AND YORK - CANARY WHARF DEVELOPMENT

 

MAIN CONTRACTOR            -         Lehrer McGovern - Bovis

 

Fabricate and Supply 28,000 tonnes Steel Tubular Piles

 

Length                                  -         28,000 mm long

 

 

DOCKLAND LIGHT RAILWAY EXTENSION - MONUMENT STATION

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate, Paint, Supply and Erect 1200 tonnes Structural Steel Work for Re-Development of Monument Underground Station

 

 

M63 MOTORWAY WIDENING

 

MAIN CONTRACTOR            -         Amec Civil Engineering

 

Supply 3500 tonnes Universal Bearing Piles

 

 

DARTFORD INTERNATIONAL FERRY TERMINAL

 

MAIN CONTRACTOR            -         John Howard

 

Fabricate and Supply 16 Dolphin Piles 90 tonnes each plus Bridges Platforms and Fender System

 

Length                                  -         40,000 mm

 


7

 

 

 

 

 

REMOVAL AND RE-ERECTION OF "PRIMROSE STREET BRIDGE" BROADGATE

 

MAIN CONTRACTOR            -         Amec Civil Engineering

 

Fabricate and Erect at Liverpool Street Station during BR

 

Possession Hours 700 tonnes Heavy Structural Steelwork

 

Assemble New Structure and Launch out under jacked up existing structure 600 tonnes

 

 

DUNBLANE BY-PASS

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Process and Supply 2500 tonnes Steel Reinforcement

 

 

CANARY WHARF DEVELOPMENT

 

MAIN CONTRACTOR            -         Christiani and Neilsen

 

Process and Supply 15,000 tonnes Steel Reinforcement

 

Pre-Fabricate Pile and Beam Cages - Tilbury